|
Gunfleet Sands I
Round One Consent Status: Consented
Construction Status: Operational
Capacity: 108 MW
Co-ordinates: 01 10.892 51 43.670 01 14.569 51 45.104 01 15.492 51 44.191 01 11.816 51 42.757
Developer: DONG Wind UK 33 Grosvenor Place London SW1X 7HY
DONG Energy Gunfleet Sands
Gunfleet Sands II
Round Two Consent Status: Consented
Construction Status: Operational
Capacity: 64 MW
Co-ordinates: 01 10.892 51 43.670 01 14.569 51 45.104 01 15.492 51 44.191 01 11.816 51 42.757
Developer: DONG Wind UK 33 Grosvenor Place London SW1X 7HY
DONG Energy Gunfleet Sands
|